- New shelter in catio
79 hits - Gluing post back together
101 hits - Drilling hole for dowel
106 hits - Using dowel marker pins. Essential!
109 hits - Putting bed back together
114 hits - "Carriage" under construction
467 hits - Radiator
482 hits
Radiator will be fixed to the shelves - Bird table in progress
499 hits
Glued with PVC cold weld solvent and clamped up - Shelves
503 hits - Shelves
505 hits - Wallpaper in the back of the new shelves
512 hits - Table with longer legs
543 hits
Extended the legs with wooden discs glued to the bottom and painted the same colour - Carriage fitted
548 hits